Project References

Project title Engineering, Procurement and Construction of RTU in 230KV Abhar Electrical substation
Client Zanjan Regional Electricity Co.
Contract type EPC_ Engineering, Procurement and Construction
Status Completed
year 2018
Scope of Work
  • Replacement of existing RTU panel with new RTU units (installation & establishing information)
  • Point-to-point testing with national and regional dispatching
  • Preparation of technical documents as national dispatching required, based on PLC and RCL
  • Advanced training in configuration methods and RTU ABB settings Replacement training course
  • Equipment List
  • SubRack 23ET24
  • Power Supply PSR00
  • AI Card 23AE23
  • DI Card 23BE23
  • DO Card 23BA20
  • Connector Housing
  • Snap-in Contacts
  • RDT4 Terminals (Including links & insulation body polyamide 6.6)
  • Other accessories
  • Project title SCADA and Telemetry in water supply system required in Mashhad Power Plant
    Client Mashhad Power Station Company
    Contract type Engineering, Procurement and Installation / PM
    Status Completed
    year
    Scope of Work In the telemetry system section of Mashhad power plant:
  • The water supply system required by Mashhad power plant, consists of 6 water wells that 2 of which are in the power plant area and 4 of which are in the plains around the power plant. The SCADA system and water telemetry of this power plant are based on HWT’s RTUs and CITECT software that was installed and constructed by the engineering team of Peyman khotoot Shargh.
  • In the protection optimization section of Allen Part:
  • There are two 12 MW Allen units in Mashhad power plant, which are one of the oldest power plant units in this power plant. Between 2006 and 2008, the re-launch operation of these units to reuse their production capacity was on the agenda of Mashhad Power Generation Management.
  • Part of this project was the provision of equipment and engineering services required to optimize the protection of the generators of these two power plants, which was carried out using equipment from the ABB brand and by the engineering team of Peyman Khotoot Shargh Company
  • Equipment List
  • HWT RTU & CITECT Software
  • Project title Upgrading and optimizing the remote terminals of Lutak and Tal Siah in Zahedan gas power plants based on the general standards of the Iran Ministry of Energy
    Client Zahedan Gas Power Plant
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    Project title Installation of interface and remote terminal of 20/63/230 kV Machchor
    Client Sistan and Balichestan Regional Electricity Co.
    Contract type Engineering, Procurement and Implementation
    Status Completed
    year 2019
    Scope of Work The subject of the contract is the installation of the interface and the remote terminal of the 20/63/230 kV Machchor in Sistan and Baluchestan according to the standards of the Ministry of Energy.
    Project title manufactur, procurement, installation, engineering services, testing and commissioning of 230 kV RTU substation system of Pasargad Qeshm power plant
    Client South Pars Gas-Condensate field Damavand- Petrochemical Co.
    Contract type Engineering, Procurement and Implementation
    Status Completed
    year 2014
    Scope of Work engineering services, procurement, performing installation, testing and commissioning works and other services for the 20 kV substation of Pasargad Qeshm power plant located in Qeshm island, Hormozgan province
    Project title Automation of substations of 230/20 kV Damavand Petrochemical Complex in Assaluyeh
    Client South Pars Gas-Condensate field Damavand- Petrochemical Co.
    Contract type Engineering, Procurement and Implementation
    Status Completed
    year 2017
    Scope of Work
  • Designing, procurement, Engineering and implementation for Automation of Electrical Substation Systems with protection relay and Siemens SICAM
  • Modification of post automation software.
  • Services provided include settings for protection and control relays of the substation, as well as power meters and measuring devices.
  • Also, the connection of relays with 103 protocols to the software and the use of the Modbas protocol for measuring devices have been successfully implemented in this project.
  • Configuration, protection and control relays, implementation of optical fiber, settings and installation of GPS and switches, design of all automation documents and monitoring of LV
  • Project title Optimization of DCS system of Akhlamd and Farmed posts
    Client Khorasan Regional Electricity Co.
    Contract type Manufacturing, Engineering, Procurement and installation
    Status Completed
    year 2018
    Scope of Work Akhlamad and Pharmad 132/20 kV substations with H busbar design have GE brand automation system and GE Nesis Ver5.5.3.0 software, which due to the problems in the operation of these substations, restart control systems, protection systems and optimization of the DCS software section was done as follows: A: As built layout and restart the control and protection sections B: DCS system software optimization
    Project title Installation of RTU and HVI in Jakigur substation
    Client Sistan and Baluchestan Regional Electricity Co.
    Contract type Manufacturing, Engineering, Procurement and installation
    Status Completed
    year 2018
    Scope of Work
  • RTU installation and operation in Jakigur Post
  • installation of HVI Jakigur Post
  • apply changes in MTU of Zahedan Post Application
  • apply changes in the control center software to send JQigor data to Zahedan according to the standards of the Ministry of Energy
  • Project title SCADA and Central control Unit with PKS RTU and ABB MicroSCADA ABB
    Client Al Mahdi Aluminum Co.
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2017
    Scope of Work Manufacturing, designing, procurement, engineering and installation to set up the SCADA system of substations 20/132/230 SCADA system of the site of Al-Mahdi Aluminum Complex In the executive operations section
    Project title SCADA and Telecommunication system 6 high voltage substations of water transfer project from the Persian Gulf to the eastern industries of the country
    Client Persian Sazeh Co.
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2019
    Scope of Work Implementation of Persian Gulf water transfer SCADA system, with ABB brand and Microscada software in 2 phase: Phase one: procurement and commissioning of the telecommunication system in the Persian Gulf 6-Substation Phase Two: Design and engineering of monitoring and control system for water transfer stations of 132 kV Persian Gulf substations in two levels Level one: Local monitoring and control system Level two: Central monitoring and control system For this part, the protocol of these six substations was established with the control center (located in station number one) through a LAN BASE protocol.
    Project title Design, supply of equipment, engineering and implementation of SCAD system of Kalat and Ashkhaneh substations in order to make them unmanned
    Client Khorasan regional electricity company
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2010
    Scope of Work Design, supply of equipment, engineering and implementation of SCAD system of Kalat and Ashkhaneh substations in order to make them unmanned
    Project title Post automation, remote control and monitoring of 20 kV Saravan feeders
    Client Sistan and Baluchestan regional electricity company
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2009
    Scope of Work
  • LSD and Dispatching Installation
  • Improvement and Development of Dispatching Software
  • Project title Contract for design, engineering, installation, testing and commissioning of equipment related to communication and telecommunication system power plant units and 132/20KV Shams Sarakhs substations and 132 kV Abutaleb line.
    Client Khorasan regional electricity company
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2013
    Scope of Work This contract was concluded between Shams Sarakhs Power Generation Company and Peyman Khotoot Shargh Company, which was finally approved by Khorasan Regional Electricity Company and all executive operations were carried out according to the announced plans and documents.
    Project title Design, engineering, procurement and commissioning of monitoring system (SCADA) for 6 kV feeders of electricity network (Shahid Hasheminejad Gas Refinery Company)
    Client Shahid Hasheminejad Gas Refinery Co. (Khangiran Gas Refinery Co.)
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2014
    Scope of Work Procurement, installation, commissioning of electricity network monitoring system including RTU and HVI panels, switch supply, PC, network cable and fiber, power meter, etc. Testing, commissioning and delivery of software engineering system
    Project title Manufacturing, engineering and procurement of the complete set of RTU modules and cabinets
    Client Sistan and Baluchestan regional electricity company
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2016
    Project title Installation of electronic protection system for drinking water treatment plant
    Client Asadiyeh Reservoir Dam
    Contract type EPC
    Status Completed
    year 2016
    Project title Manufacturing, engineering, procurement and construction of the complete set of RTU modules and cabinets
    Client Sistan and Baluchestan regional electricity company
    Contract type EPC
    Status Completed
    year 2015
    Project title Design, engineering, procurement, commissioning and testing of Telemetry System
    Client Sarakhs Special Economic Zone and Mahtab Group
    Contract type Deigning, Engineering, procurement and test
    Status Completed
    year 2011
    Project title Engineering, Procurement, and Construction Hitachi & ABB RTU
    Client Khorasan regional electricity company
    Contract type EPC_ Engineering, Procurement, and Construction Hitachi & ABB RTU
    Status Completed
    year 2013
    Project title Supply of telecommunication network ring equipment
    Client Khorasan regional electricity company
    Contract type Procurement and installation
    Status Completed
    year 2014
    Project title LSD and Dispatching Installation
    Client Sistan and Baluchestan regional electricity company
    Contract type EPC
    Status Completed
    year 2010
    Project title Procurement and Spare part
    Client Fars regional electricity company
    Contract type Purchase Contract
    Status Completed
    year 2015
    Project title Installation of Interface panel and cabinets
    Client Sistan and Baluchestan regional electricity company
    Contract type Installation and construction
    Status Completed
    year 2017
    Project title Manufacturing, Engineering, procurement and test Marshaling Racks and SCADA Interfacing
    Client Khorasan regional electricity company
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2009
    Project title Gateway installation and configuration Nahbandan electrical substation
    Client Khorasan regional electricity company
    Contract type EPC
    Status Completed
    year 2017
    Project title 132KV electrical substation optimization
    Client Khorasan regional electricity company
    Contract type Engineering and procurement
    Status Completed
    year 2017
    Project title Procurement and Construction PLC-SIMATIC C7-626
    Client Mashhad Light rail transit (MLRT)
    Contract type Procurement and Construction
    Status Completed
    year
    Project title Procurement of equipment and installation of CCTV and electronic protection system
    Client Gilan regional electricity company
    Contract type EPC
    Status Completed
    year 2010
    Project title Procurement, installation and construction 8 rack unit 20KV
    Client Khorasan regional electricity company
    Contract type Procurement, installation and construction
    Status Completed
    year 2015
    Project title Procurement, installation and construction 8 rack unit 20KV
    Client Khorasan regional electricity company
    Contract type Procurement
    Status Completed
    year 2013
    Project title Procurement of Gonabad and Kaveh Mashhad dispatching units
    Client Khorasan regional electricity company
    Contract type Procurement
    Status Completed
    year 2012
    Project title 63KV to 132KV dispatching development system
    Client Khorasan regional electricity company
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2010
    Project title Manufacturing, Engineering, procurement 4 units RTU
    Client Khorasan regional electricity company
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2015
    Project title Engineering, procurement GPS Unit
    Client Khorasan regional electricity company
    Contract type Engineering, procurement
    Status Completed
    year 2015
    Project title consulting services
    Client Khorasan regional electricity company
    Contract type consulting services
    Status Completed
    year 2015
    Project title Replacement and substation Dong Fang terminal unit
    Client Khorasan regional electricity company
    Contract type Engineering
    Status Completed
    year 2015
    Project title Installation of 7 units MV & LV Transformer
    Client Sistan and Baluchestan regional electricity company
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2010
    Project title Zar Abad 230KV Substation RTU
    Client Sistan and Baluchestan regional electricity company
    Contract type Manufacturing, Engineering, procurement and Construction
    Status Completed
    year 2013
    Project title 500 Barrels-Transformer oil procurement
    Client Khorasan regional electricity company
    Contract type procurement
    Status Completed
    year 2012
    Project title procurement of 27 units Distance Relay
    Client Moj Niroo Co.
    Contract type procurement
    Status Completed
    year 2012
    Project title ABB RTU Procurement and Construction
    Client Sistan and Baluchestan regional electricity company
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2010
    Project title Procurement of LSD for Control Center Unit in Head office
    Client Sistan and Baluchestan regional electricity company
    Contract type Procurement
    Status Completed
    year 2009
    Project title 1 unit RTU Manufacturing, Engineering, procurement and construction
    Client Khorasan regional electricity company
    Contract type EPC- Engineering, procurement and construction
    Status Completed
    year 2011
    Project title 20KV fibering and automation
    Client Sistan and Baluchestan regional electricity company
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2009
    Project title Active telecommunication equipment for 132KV Toos and Khaje Rabi
    Client Khorasan regional electricity company
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2011
    Project title Engineering, Procurement and Construction Ashkhane Monitoring and Control System
    Client Sarv Niroo Toos
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2009
    Project title Control and Monitoring
    Client Charmahal & Bakhtiari regional water company
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2013
    Project title consulting services
    Client Khorasan regional electricity company
    Contract type consulting services
    Status Completed
    year 2016
    Project title Electrical Insulation and covering equipments
    Client Khorasan regional electricity company
    Contract type Procurement
    Status Completed
    year 2014
    Project title Dispatching Construction services
    Client Khorasan regional electricity company
    Contract type Installation Services
    Status Completed
    year 2014
    Project title Dispatching Construction services
    Client Khorasan regional electricity company
    Contract type Installation Services
    Status Completed
    year 2016
    Project title Improvement and Development of Dispatching Software
    Client Sistan and Baluchestan regional electricity company
    Contract type ESCO_ Energy Service Company
    Status Completed
    year 2011
    Project title Switchgear insulation
    Client Pars Jolfa Co.
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2011
    Project title Engineering, Upgrading and Replacement Hitachi terminal units
    Client Khorasan regional electricity company
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2011
    Project title Collection of fractional signals from substations
    Client Sistan and Baluchestan regional electricity company
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2011
    Project title Software hardware upgrading
    Client Sistan and Baluchestan regional electricity company
    Contract type Engineering
    Status Completed
    year 2015
    Project title RTU Upgrading and development
    Client Sistan and Baluchestan regional electricity company
    Contract type Manufacturing, Engineering, procurement and construction
    Status Completed
    year 2017
    Project title Caballing Cabinet Engineering, Procurement and Construction
    Client Kerman regional electricity company
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2011
    Project title Daregaz Substation- construction
    Client Khorasan regional electricity company
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2016
    Project title Ferdosi SCADA equipment Procurement
    Client Khorasan regional electricity company
    Contract type Procurement
    Status Completed
    year 2010
    Project title HVI Procurement
    Client Attar Industrial Park Neyshaboor
    Contract type Procurement
    Status Completed
    year 2012
    Project title Development of lighting network in Zahedan city
    Client Sistan and Baluchestan regional electricity company
    Contract type Engineering and procurement
    Status Completed
    year 2012
    Project title Khorasan Dispatching development
    Client Khorasan regional electricity company
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2014
    Project title Procurement of RTU Cards and modules
    Client Khorasan regional electricity company
    Contract type Manufacturing, Engineering, procurement and construction
    Status Completed
    year 2014
    Project title Procurement of auxiliary relay for control unit
    Client Khorasan regional electricity company
    Contract type Procurement
    Status Completed
    year 2014
    Project title Procurement of ABB RTU560
    Client Kian Transfo Ind.
    Contract type Procurement
    Status Completed
    year 2014
    Project title Procurement of ABB RTU560
    Client Tavan Gostar Daghigh Co.
    Contract type Procurement
    Status Completed
    year 2013
    Project title Procurement of RTU
    Client Power Technology Pyramids Co. (PTP)
    Contract type Procurement
    Status Completed
    year 2014
    Project title RTU procurement and construction for Automation of Electrical Substation Systems
    Client South Pars Gas-Condensate field Damavand- Petrochemical Co.
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2014
    Project title Preparation of a comprehensive automation planning
    Client Mashhad Electric energy Distribution Co.
    Contract type Research agreement
    Status Completed
    year 2010
    Project title Procurement of automation and protection HV electric substation equipment
    Client Afarineh Toos Co.
    Contract type procurement
    Status Completed
    year 2011
    Project title HV Telemetry procurement
    Client Sarakhs Special Economic Zone and Mahtab Group
    Contract type procurement
    Status Completed
    year 2011
    Project title MHI Installation and MTU replacement
    Client Sistan and Baluchestan Regional Electricity Co.
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2014
    Project title Procurement SCADA System Equipment
    Client Khorasan Regional Electricity Co.
    Contract type Procurement and Engineering
    Status Completed
    year 2014
    Project title Procurement of HV RTU
    Client Khorasan Regional Electricity Co.
    Contract type procurement
    Status Completed
    year 2014
    Project title Procurement of HV RTU
    Client Khorasan Regional Electricity Co.
    Contract type procurement
    Status Completed
    year 2013
    Project title HV RTU Manufacturing, Engineering, procurement and construction
    Client MAPNA Group
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year
    Project title RTU Manufacturing, Engineering, procurement and construction
    Client GodsNiroo Engineering Co. & Pasargad Energy Development Co. (PEDC)
    Contract type Manufacturing, Engineering, procurement and construction
    Status Completed
    year
    Project title Correction and reconstruction HV Electric Substation
    Client Sistan and Baluchestan Regional Electricity Co.
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2008
    Project title Construction of 10km MV Electric network
    Client Sistan and Baluchestan Regional Electricity Co.
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2009
    Project title Execution of operations Pictography
    Client Sistan and Baluchestan Regional Electricity Co.
    Contract type Engineering
    Status Completed
    year 2009
    Project title Correction and reconstruction HV Electric Substation PART2
    Client Sistan and Baluchestan Regional Electricity Co.
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2008
    Project title Correction and reconstruction HV Electric Substation PART3
    Client Sistan and Baluchestan Regional Electricity Co.
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2008
    Project title Manufacturing, engineering services and installation of RTU units
    Client Sistan and Baluchestan Regional Electricity Co.
    Contract type Manufacturing, Engineering, procurement and construction
    Status Completed
    year 2011
    Project title Procurement of 10 units of RTU
    Client Fars Regional Electricity Co.
    Contract type Procurement
    Status Completed
    year 2018
    Project title Procurement of 20 units of RTU
    Client Fars Regional Electricity Co.
    Contract type Procurement
    Status Completed
    year 2017
    Project title Procurement of RTU 6 units Flash and 18 units CPU set
    Client Khorasan Regional Electricity Co.
    Contract type Procurement
    Status Completed
    year 2018
    Project title RTU Spare part Procurement
    Client Fars Regional Electricity Co.
    Contract type Procurement
    Status Completed
    year 2018
    Project title Video surveillance of Astana warehouse and Gilan electricity headquarters
    Client Gilan Regional Electricity Co.
    Contract type Engineering, Procurement and Instalation
    Status Completed
    year 2018
    Project title RTU System Manufacturing, Engineering, construction
    Client Gachsaran 25MW Power Plant
    Contract type Manufacturing, Engineering, procurement and construction
    Status Completed
    year 2019
    Project title RTU Units for Razavi Shrine
    Client Mashhad Shrine Civil Development Organization
    Contract type Manufacturing, Engineering, procurement and construction
    Status Completed
    year 2009
    Project title Manufacturing of 7 units of RTU
    Client Sistan and Baluchestan Regional Electricity Co.
    Contract type Manufacturing
    Status Completed
    year 2019
    Project title Manufacturing of 15 units of RTU
    Client Tehran Regional Electricity Co.
    Contract type Manufacturing
    Status Completed
    year 2019
    Project title Manufacturing of RTU unit and Transducer devices
    Client Khorasan Regional Electricity Co.
    Contract type Manufacturing, Engineering, procurement and construction
    Status Completed
    year 2019
    Project title HDLC Engineering and services
    Client Bakhtar Regional Electricity Co.
    Contract type Engineering, Procurement
    Status Completed
    year 2017
    Project title SCADA and Central control Unit with PKS RTU and ABB MicroSCADA ABB
    Client Al Mahdi Aluminum Co.
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2019
    Project title SCADA and Telecommunication system 6 high voltage substations of water transfer project from the Persian Gulf to the eastern industries of the country
    Client Persian Sazeh Co.
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2019
    Project title Manufacturing, Engineering, procurement 2 set of RTU513 and Cabinets
    Client Isfahan Regional Electricity Co.
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2020
    Project title Manufacturing, Engineering, procurement 3 set of RTU513 and Cabinets
    Client Tehran Regional Electricity Co.
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2019
    Project title Engineering and procurement 9 units CMU05
    Client Sistan and Baluchestan Regional Electricity Co.
    Contract type procurement
    Status Completed
    year 2018
    Project title Manufacturing of RTU Spare Part
    Client Sistan and Baluchestan Regional Electricity Co.
    Contract type Manufacturing, procurement
    Status Completed
    year 2018
    Project title Manufacturing, procurement of 20units Subracks
    Client Fars Regional Electricity Co.
    Contract type Manufacturing, procurement
    Status Completed
    year 2018
    Project title Engineering, Procurement and Construction Abhar Electrical substation
    Client Zanjan Regional Electricity Co.
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2018
    Project title Engineering, procurement RTU Cards compatible with ABB560
    Client Khorasan Regional Electricity Co.
    Contract type Engineering, procurement
    Status Completed
    year 2019
    Project title Engineering, procurement 4 units of Mini RTU
    Client Khorasan Regional Electricity Co.
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2019
    Project title Design and implementation of electricity network monitoring
    Client Khangiran gas refinery
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2020
    Project title RTU Installation in Matchcore village
    Client Sistan and Baluchestan Regional Electricity Co.
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2018
    Project title Engineering, Procurement and Construction of RTU in 230KV Abhar Electrical substation
    Client Zanjan Regional Electricity Co.
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2018
    Scope of Work
  • Replacement of existing RTU panel with new RTU units (installation & establishing information)
  • Point-to-point testing with national and regional dispatching
  • Preparation of technical documents as national dispatching required, based on PLC and RCL
  • Advanced training in configuration methods and RTU ABB settings Replacement training course
  • Equipment List
  • SubRack 23ET24
  • Power Supply PSR00
  • AI Card 23AE23
  • DI Card 23BE23
  • DO Card 23BA20
  • Connector Housing
  • Snap-in Contacts
  • RDT4 Terminals (Including links & insulation body polyamide 6.6)
  • Other accessories
  • Project title SCADA and Telemetry in water supply system required in Mashhad Power Plant
    Client Mashhad Power Station Company
    Contract type Engineering, Procurement and Installation / PM
    Status Completed
    year
    Scope of Work In the telemetry system section of Mashhad power plant:
  • The water supply system required by Mashhad power plant, consists of 6 water wells that 2 of which are in the power plant area and 4 of which are in the plains around the power plant. The SCADA system and water telemetry of this power plant are based on HWT’s RTUs and CITECT software that was installed and constructed by the engineering team of Peyman khotoot Shargh.
  • In the protection optimization section of Allen Part:
  • There are two 12 MW Allen units in Mashhad power plant, which are one of the oldest power plant units in this power plant. Between 2006 and 2008, the re-launch operation of these units to reuse their production capacity was on the agenda of Mashhad Power Generation Management.
  • Part of this project was the provision of equipment and engineering services required to optimize the protection of the generators of these two power plants, which was carried out using equipment from the ABB brand and by the engineering team of Peyman Khotoot Shargh Company
  • Equipment List
  • HWT RTU & CITECT Software
  • Project title Upgrading and optimizing the remote terminals of Lutak and Tal Siah in Zahedan gas power plants based on the general standards of the Iran Ministry of Energy
    Client Zahedan Gas Power Plant
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    Project title Installation of interface and remote terminal of 20/63/230 kV Machchor
    Client Sistan and Balichestan Regional Electricity Co.
    Contract type Engineering, Procurement and Implementation
    Status Completed
    year 2019
    Scope of Work The subject of the contract is the installation of the interface and the remote terminal of the 20/63/230 kV Machchor in Sistan and Baluchestan according to the standards of the Ministry of Energy.
    Project title manufactur, procurement, installation, engineering services, testing and commissioning of 230 kV RTU substation system of Pasargad Qeshm power plant
    Client South Pars Gas-Condensate field Damavand- Petrochemical Co.
    Contract type Engineering, Procurement and Implementation
    Status Completed
    year 2014
    Scope of Work engineering services, procurement, performing installation, testing and commissioning works and other services for the 20 kV substation of Pasargad Qeshm power plant located in Qeshm island, Hormozgan province
    Project title Automation of substations of 230/20 kV Damavand Petrochemical Complex in Assaluyeh
    Client South Pars Gas-Condensate field Damavand- Petrochemical Co.
    Contract type Engineering, Procurement and Implementation
    Status Completed
    year 2017
    Scope of Work
  • Designing, procurement, Engineering and implementation for Automation of Electrical Substation Systems with protection relay and Siemens SICAM
  • Modification of post automation software.
  • Services provided include settings for protection and control relays of the substation, as well as power meters and measuring devices.
  • Also, the connection of relays with 103 protocols to the software and the use of the Modbas protocol for measuring devices have been successfully implemented in this project.
  • Configuration, protection and control relays, implementation of optical fiber, settings and installation of GPS and switches, design of all automation documents and monitoring of LV
  • Project title Optimization of DCS system of Akhlamd and Farmed posts
    Client Khorasan Regional Electricity Co.
    Contract type Manufacturing, Engineering, Procurement and installation
    Status Completed
    year 2018
    Scope of Work Akhlamad and Pharmad 132/20 kV substations with H busbar design have GE brand automation system and GE Nesis Ver5.5.3.0 software, which due to the problems in the operation of these substations, restart control systems, protection systems and optimization of the DCS software section was done as follows: A: As built layout and restart the control and protection sections B: DCS system software optimization
    Project title Installation of RTU and HVI in Jakigur substation
    Client Sistan and Baluchestan Regional Electricity Co.
    Contract type Manufacturing, Engineering, Procurement and installation
    Status Completed
    year 2018
    Scope of Work
  • RTU installation and operation in Jakigur Post
  • installation of HVI Jakigur Post
  • apply changes in MTU of Zahedan Post Application
  • apply changes in the control center software to send JQigor data to Zahedan according to the standards of the Ministry of Energy
  • Project title SCADA and Central control Unit with PKS RTU and ABB MicroSCADA ABB
    Client Al Mahdi Aluminum Co.
    Contract type EPC_ Engineering, Procurement and Construction
    Status Completed
    year 2017
    Scope of Work Manufacturing, designing, procurement, engineering and installation to set up the SCADA system of substations 20/132/230 SCADA system of the site of Al-Mahdi Aluminum Complex In the executive operations section
    Project title SCADA and Telecommunication system 6 high voltage substations of water transfer project from the Persian Gulf to the eastern industries of the country
    Client Persian Sazeh Co.
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2019
    Scope of Work Implementation of Persian Gulf water transfer SCADA system, with ABB brand and Microscada software in 2 phase: Phase one: procurement and commissioning of the telecommunication system in the Persian Gulf 6-Substation Phase Two: Design and engineering of monitoring and control system for water transfer stations of 132 kV Persian Gulf substations in two levels Level one: Local monitoring and control system Level two: Central monitoring and control system For this part, the protocol of these six substations was established with the control center (located in station number one) through a LAN BASE protocol.
    Project title Design, supply of equipment, engineering and implementation of SCAD system of Kalat and Ashkhaneh substations in order to make them unmanned
    Client Khorasan regional electricity company
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2010
    Scope of Work Design, supply of equipment, engineering and implementation of SCAD system of Kalat and Ashkhaneh substations in order to make them unmanned
    Project title Post automation, remote control and monitoring of 20 kV Saravan feeders
    Client Sistan and Baluchestan regional electricity company
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2009
    Scope of Work
  • LSD and Dispatching Installation
  • Improvement and Development of Dispatching Software
  • Project title Contract for design, engineering, installation, testing and commissioning of equipment related to communication and telecommunication system power plant units and 132/20KV Shams Sarakhs substations and 132 kV Abutaleb line.
    Client Khorasan regional electricity company
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2013
    Scope of Work This contract was concluded between Shams Sarakhs Power Generation Company and Peyman Khotoot Shargh Company, which was finally approved by Khorasan Regional Electricity Company and all executive operations were carried out according to the announced plans and documents.
    Project title Design, engineering, procurement and commissioning of monitoring system (SCADA) for 6 kV feeders of electricity network (Shahid Hasheminejad Gas Refinery Company)
    Client Shahid Hasheminejad Gas Refinery Co. (Khangiran Gas Refinery Co.)
    Contract type Manufacturing, Engineering, procurement
    Status Completed
    year 2014
    Scope of Work Procurement, installation, commissioning of electricity network monitoring system including RTU and HVI panels, switch supply, PC, network cable and fiber, power meter, etc. Testing, commissioning and delivery of software engineering system